The building was delivered on a brown field city centre site with the construction being steel frame with insitu composite floors. The curved facades and split level roof presented a number of challenges for the structural design. The project required extensive ground modelling to minimise the volume of materials being exported from site, together with comprehensive ground engineering to allow a lime stabilized solution to be adopted in lieu of the vibro piling which had been detailed by the incumbent structural engineers. This enabled an increased ground pressure to be achieved, resulting in pad foundation sizes being reduced accordingly.
For further information regarding this project please contact Steve Wedge, Project Director.