• CWA - LinkedIn
  • CWA - Twitter
Intelligent Engineering
CWA Engineering - Mancetter - Civil & Structural Engineering
CWA Engineering - Mancetter - Civil & Structural Engineering

Residential Development – Church Walk Mancetter

  • Client:
    Housing 21 - Willmott Dixon

  • Location:
    Mancetter

  • Project Value:
    £11m

  • Services Provided:
    Civil and Structural Engineering Consultancy Services

  • Added Value:
    Utilising ground remodeling techniques along with the sites natural topography, CWA designed the site levels to optimise the best use of the sloping conditions and through value engineering with the contractor we were able to deliver a successful and affordable project to the end.

  • PDF Download:
    Residential Development – Church Walk Mancetter
Description

This new extra care facility comprises of 70 apartments, along with supporting communal facilities in the form of lounge areas, dining space, salon, laundry, and staff offices and facilities.

In addition to this there are 10 separate bungalows that have been designed in accordance with lifetime homes that have their own private gardens with access to the communal facilities provided in the adjacent extracare building.

Related Projects
The Lansdowne
The Lansdowne
The project includes a block of 206 high-end apartments close to Five Ways in...
Read More
Orbit Extracare, Queensway
Orbit Extracare, Queensway
A combination of flat and pitched roofs over load-bearing masonry with precast concrete floor planks. The...
Read More
Mercia Grange Care Home
Mercia Grange Care Home
The 3-storey main building was constructed as a load bearing masonry construction with areas...
Read More