
Single storey steel framed and composite floor transfer structure at first floor level, carrying a further three storeys of timber framed hotel construction. Built alongside a canal, on a previously contaminated site, with the requirement for the diversion of existing gas pipelines to accommodate the new construction.
Surface water attenuation provided within the site access road.