
The design of the building was centred around achieving very low energy running costs for Grade A office accommodation whilst providing open plan flexible accommodation. To achieve this a chilled beam air conditioning system was utilised which required high thermal mass and no downstand beams beneath floor plates.
CWA adopted a Slimfloor beam and precast floor solution which satisfied stringent M&E requirements whilst also allowing fastrack construction techniques and processes.