This development was the second phase of  'Coventry Increasing Pupil Places' programme, increasing the school from a two form of entry to a three.
  • Client:
    Coventry City Council

  • Location:
    Coventry

  • Project Value:
    £2,400,000

  • Services Provided:
    Civil and Structural Engineering Consultancy

  • Added Value:
    The use of the Revit BIM ensured an accurate and fully co-ordinated frame design was completed within a tight programme and site constraints.

  • PDF Download:
    Hollyfast Primary School, Coventry
Description

The development comprised of two extensions to the existing school, the first being a single storey reception classroom block to the West of the site, providing the reception year with an additional 3 No. classrooms, and the second being a two storey teaching block to the North of the site, providing year 5 & 6 pupils with a further 3 No. classrooms each, with the addition of a resource and group centre along with a new ICT/Library suite.

Both the new single and two storey classroom extensions comprised a steel frame, with a composite deck solution for the first floor of the two storey extension, both built off pad and strip foundations, with a ground bearing reinforced slab solution.

Reinforced cantilever ground beams were required to support the steel frame structure at the interface between the new structure and the existing building.

Related Projects
St Bartholomew’s Primary School, Leicestershire
St Bartholomew’s Primary School, Leicestershire
Extensive increase in capacity by more than doubling the size of the existing building....
Read More
Park Hill Primary School, Coventry
Park Hill Primary School, Coventry
The primary structure consists of a braced steel frame with a suspended precast concrete...