The construction features piled foundations, steel frame and insitu concrete composite floors.
Client:
Hinckley & Bosworth Borough Council/Places for People Leisure Management/Pellikaan Construction
Location:
Leicestershire
Project Value:
£13,500,000
Services Provided:
Civil & Structural Engineering Consultancy
Added Value:
Utilising ground remodelling technique, along with the sites natural topography, CWA designed the site levels to optimise the best use of the sloping conditions. This has enabled the pool tanks to be constructed "above ground" with an undercroft being formed around the tanks for future inspection and maintenance, along with service distribution.
The project comprises a 25m x 8 lane pool with partial moveable floor, spectator viewing gallery, learner pool with full moveable floor, splash pool, fitness studio, dance studios and an 8 court sports hall.
RT @AssociatedA: The @ThomasTUTC extension tops out. The 3-storey, £12.6 million extension houses a 4,500sq.m teaching building, spo… https://t.co/IakfTr01Q5
RT @p_hutt: Cllr Carol Hart - Cabinet Member for Health & Communities @Derbyshirecc with Robert Stobo - Project Manager… https://t.co/dEsNGU4RJj