

The three storey building is constructed of load bearing masonry with precast floors, a trussed rafter roof and traditional mass concrete strip and pad foundations. The construction incorporates a steel transfer structure, supporting two storeys of accomodation over and a split ground floor level achieved by reinforced concrete retaining walls.
For further information please contact Project Director, Steve Wedge