

The project has been delivered on a brown field site in Birmingham City Centre. The building comprises a six storey steel frame with clear span, column free floor plates at every level. The ground conditions were re-engineered to allow for traditional shallow foundations to be adopted.
The building is clad with Trespa rain screen cladding, featuring a glazed atrium which rises the full height of the building. The project incorporates numerous environmentally and sustainable technologies, achieving a BREEAM rating of Excellent.