• CWA - LinkedIn
  • CWA - Twitter
Intelligent Engineering

Prior to commencing the construction phase it was necessary to demolish the existing framed building and sub structures to the site perimeter.

The site consists of three new four and five storey buildings with the refurbishment of the remaining building fronting Bradford and Birchill Street.

As well as the refurbishment of the existing building, a two storey vertical extension has been incorporated as part of the proposed development.

The three new four and five storey buildings are steel frames on piled foundations with precast floor construction to all floors.